ElementumElementum

X5 Retail Group

Refrigeration for a distribution centre

Equipment selection and supply of air-cooled condensers and condensing units for a new distribution centre of a national retail chain.

Challenge

Deliver refrigeration for a distribution centre with multiple temperature zones on a tight schedule, with redundancy and low energy consumption.

Solution

We selected a range of air-cooled condensers and condensing units matched to the actual heat loads of each zone, manufactured them in-house and ran bench tests before despatch.

Result

An 18% reduction in energy consumption against the baseline design, with a six-week lead time.

Discuss your project